Equipment, calibration and maintenance
Every instrument with its calibration and maintenance history and next due date. The month ahead is on a calendar, and the owner is reminded before anything lapses.
Keep the records that keep a site running: what was calibrated, maintained, inspected or approved, by whom, and what is due next. Owners are reminded before something lapses, and every entry is signed and dated when it is made.
Each one is an ordinary table with a page and reminders you can change. The starting templates give you a working process on day one.
Every instrument with its calibration and maintenance history and next due date. The month ahead is on a calendar, and the owner is reminded before anything lapses.
Approved suppliers with their qualification status, certificates and expiry dates, so you know who you may buy from, and when a certificate needs renewing.
Checklists on a page for rounds, cleaning, temperatures and checks, signed and dated when they're completed, with a corrective action started when a reading is out of limit.
Record each reading against its limit. A reading outside the limit stands out, and a rule can open a corrective action so it doesn't depend on someone remembering.
Reagents, standards, raw materials and packaging are tracked by lot, with expiry reminders and Quality's signed release before anything is used. The same workspace holds the supplier it came from and the equipment it is used on.
Qualsted gives you the controls and the records; your procedures, training and validation of your own configuration complete the picture.
| Requirement | How Qualsted helps |
|---|---|
| ISO 9001 §7.1.5 · ISO/IEC 17025 §6.4 | Equipment and measuring resources. Calibration and maintenance history with due dates, owners and reminders. |
| ISO 9001 §8.4 · ISO 13485 §7.4 | Purchasing and supplier control. Approved suppliers, qualification status and certificates with expiry dates. |
| 21 CFR 11.10(e) | Audit trail. Who created, changed or signed a record and when, recorded by the server and impossible to edit. |
| 21 CFR 11.50 · 11.70 | Signatures linked to records. Each entry shows the signer, the time and its meaning, and stays attached to what it approved. |
Working processes with signatures, reminders and views set up, as ordinary tables and pages you can change.
An equipment register with calibration records reviewed by Quality, and reminders two weeks before calibration falls due.
21 CFR 211.68 · FDA QMSR (21 CFR 820) · ISO 9001 §7.1.5 · ISO/IEC 17025 §6.4 · ISO 13485 §7.6
Approved suppliers with their risk, certificates and qualification, approved by Quality and requalified every year.
FDA QMSR (21 CFR 820) · ISO 9001 §8.4 · ISO 13485 §7.4 · AS9100 §8.4 · EU GMP Ch. 5
An item master, lots with expiry dates and storage locations, a Quality release before stock is used, a log of every receipt and use, and reminders before lots expire.
21 CFR 211.80 · 211.84 · 211.122 · FDA QMSR (21 CFR 820) · ISO 13485 §7.4 · §7.5.5 · ISO/IEC 17025 §6.6
Monitor critical control points, signed and dated when they're made, with a corrective action opened whenever a limit isn't met and daily verification.
21 CFR 117 Subpart C · 21 CFR 120 · Codex HACCP · SQF · BRCGS
Pre-operational inspections of each area before production starts, signed and dated when they're made, with a corrective action opened whenever an area fails and re-inspection before release.
21 CFR 117.35 · 21 CFR 117.80 · SQF · BRCGS
It covers calibration and maintenance records, due dates and reminders for the equipment you must keep in control. It isn't a work-order system with spare-parts costing, and it isn't meant to replace one.
Yes. Import equipment, suppliers and history from CSV or Excel files; large imports run in the background while people keep working.
Print a QR label for each piece of equipment or lot and scan it with a phone camera or a handheld scanner to open its record. Read-only viewer seats are free.
The owner you set on the record, ahead of the due date and again if it passes, with Quality told for the records you choose.